Diploma of Civil Construction Management

The complete RTO resource set for the whole RII50420 qualification and mapped to the current national release.

The whole qualification, done

Every unit in the qualification:

Every unit in RII50420, all included

50 units: 5 core and 45 elective.

Core units 5

Elective units 45

Show all 45 elective units
  • BSBPMG534Manage project human resources
  • BSBPMG535Manage project information and communication
  • BSBPMG536Manage project risk
  • BSBPMG537Manage project procurement
  • BSBPMG540Manage project integration
  • BSBSTR501Establish innovative work environments
  • BSBSTR502Facilitate continuous improvement
  • LGACOM401AAdminister contracts
  • LGAWORK501APrepare preliminary design for operational works
  • LGAWORK502APrepare detailed works project documentation
  • LGAWORK503AUndertake project investigation
  • MSL924003Process and interpret data
  • MSL925004Analyse data and report results
  • MSL954004Obtain representative samples in accordance with sampling plan
  • MSL973021Conduct field-based acceptance tests for construction materials
  • MSL973022Conduct laboratory-based acceptance tests for construction materials
  • MSL974026Perform tests to determine the properties of construction materials
  • MSL975031Supervise sampling, inspections and testing at construction sites
  • MSL975044Perform complex tests to measure engineering properties of materials
  • RIIBLA401EManage blasting operations
  • RIIBLA403Design blasts
  • RIICWD503EPrepare traffic management plans and traffic guidance schemes
  • RIICWD538Prepare traffic management plans and traffic guidance schemes for high volume roads
  • RIICWD539Prepare traffic management plans and traffic guidance schemes for motorways and freeways
  • RIICWM501EImplement civil construction plans
  • RIICWM502EImplement civil works maintenance programs
  • RIICWM503EPrepare civil works cost estimates
  • RIICWM504EPrepare civil works bill of quantities
  • RIICWM505EPrepare civil works schedule of rates
  • RIILAT402EProvide leadership in the supervision of diverse work teams
  • RIIRAI502DDevelop and implement site plant and resource management plan
  • RIIRIS403EManage and coordinate spill response
  • RIISAM501EImplement and maintain the site plant, equipment and infrastructure maintenance plans

Matched to the current release

Every order is confirmed against RII50420's current training.gov.au release at fulfilment, so you always receive resources mapped to the national register.