Certificate III in Civil Construction

The complete RTO resource set for the whole RII30926 qualification and mapped to the current national release.

The whole qualification, done

Every unit in the qualification:

Every unit in RII30926, all included

202 units: 8 core and 194 elective.

Core units 8

Elective units 194

Show all 194 elective units
  • FWPCOT2273Trim and cut felled trees
  • FWPCOT3350Fell trees manually (intermediate)
  • HLTAID011Provide First Aid
  • ICTCBL334Install underground enclosures and conduit
  • PMBWELD301EJoin polyethylene plastic pipelines using butt welding
  • PMBWELD302EJoin polyethylene plastic pipelines using electrofusion welding
  • RIIBEF202EIdentify and rectify site operating problems
  • RIIBEF301DRun on-site operations
  • RIIBEF402DSupervise on-site operations
  • RIIBLA201ESupport shotfiring operations
  • RIIBLA202FSupport underground shotfiring operations
  • RIIBLA205EStore, handle and transport explosives
  • RIIBLA301EConduct surface shotfiring operations
  • RIIBLA303EConduct underground development shotfiring
  • RIICBM201EStrip pile heads
  • RIICBM301EMaintain concrete bridges
  • RIICBM302EInstall pre-cast girders
  • RIICBM303EInstall pre-cast parapets
  • RIICBM304EOperate bridge inspection units
  • RIICBM305EInstall pre-cast concrete bridge decks
  • RIICBM306EUndertake concreting work on concrete bridges
  • RIICBM307EConstruct formwork and false work on concrete bridges
  • RIICBS202EHand spread asphalt
  • RIICBS203ESafely handle bituminous materials
  • RIICBS207ETake samples of road surfacing materials
  • RIICBS301EConduct profile planer operations
  • RIICBS302EConduct paver screeding operations
  • RIICBS303EConduct materials transfer vehicle operations
  • RIICBS304ECompact asphalt with rollers
  • RIICBS305EConduct asphalt paver operation
  • RIICBS306EConduct micro surfacing operations
  • RIICBS307EConduct bitumen sprayer operations
  • RIICBS308ELoad aggregate using purpose built loaders
  • RIICBS309EConduct self-propelled aggregate spreader operations
  • RIICBS310EConduct patching operations
  • RIICBS311EProduce asphalt products
  • RIICBS312EConduct bitumen tanker operations
  • RIICBS313Conduct tack coat spraying operations
  • RIICBS314Conduct aggregate spreader box operations
  • RIICBS315Roll aggregate in sprayed sealing operations
  • RIICBS316Conduct pavement sweeping operations
  • RIICBS317Conduct road maintenance operations
  • RIICBS402ESupervise the application of bituminous sprayed treatments
  • RIICCM202Identify, locate and protect underground services
  • RIICCM205FCarry out manual excavation
  • RIICCM206Support plant operations
  • RIICCM207ESpread and compact materials manually
  • RIICCM208Carry out basic levelling
  • RIICCM209Carry out concrete work
  • RIICCM210Install trench support
  • RIICCM211EConstruct and dismantle fences and gates
  • RIICFW301EConstruct underpinning
  • RIICFW302EInstall temporary and permanent rock anchors
  • RIICFW303EInstall primary ground supports
  • RIICFW304EConduct pile driving operations
  • RIICFW305EConduct cast in-situ pilings operations
  • RIICFW306EDirect pile driving operations
  • RIICFW307EDirect cast in-situ piling operations
  • RIICFW308Conduct screw piling operations
  • RIICPL301EInstall water mains pipelines
  • RIICPL302EInstall stormwater systems
  • RIICPL303EInstall sewer pipelines
  • RIICPL304EInstall pre-cast gully pits
  • RIICPL305EInstall pre-cast access chambers
  • RIICRC201ERepair potholes
  • RIICRC202EInstall signs
  • RIICRC203EInstall sub-soil drainage
  • RIICRC204EInstall and maintain roadside fixtures
  • RIICRC205EInstall utility poles
  • RIICRC206EInstall pre-cast concrete crash barriers
  • RIICRC207EInstall noise barriers
  • RIICRC208ELay pipes
  • RIICRC209ELay reinforced concrete box culverts
  • RIICRC301EMaintain drainage systems
  • RIICRC302EPlace and form concrete kerb, channel and fixtures
  • RIICRC303ELay pavers
  • RIICRC304EMaintain sealed roads
  • RIICRC305EConduct road construction paver screeding operations
  • RIICRC306EConduct earthworks
  • RIICRC307EConduct road pavement construction
  • RIICRC309EConduct stabiliser operations
  • RIICRC311EConduct concrete road paver operations
  • RIICRC312ESet up and maintain concrete paver stringlines
  • RIICRC313EConduct concrete road curing and texturing operations
  • RIICRC314EHandle concrete materials
  • RIICRC315EUse concreting materials and equipment
  • RIICRC316EPlace and compact concrete
  • RIICRC317EFinish concrete pavements
  • RIICRC318ECure concrete
  • RIICRC319ESaw and cut concrete pavements to initiate planned cracks
  • RIICRC320ESeal concrete pavements
  • RIICRC321EUse automated paving guidance systems
  • RIICRC322EReceive, check and record concrete deliveries
  • RIICRC323EInsert tie bars in fresh concrete
  • RIICRM201FEscort mobile works
  • RIICRM202EHandle and store road marking materials
  • RIICRM203EConduct pedestrian road marking operations
  • RIICRM204EPrepare surfaces for road marking
  • RIICRM205EConduct road marking measuring operations
  • RIICRM206EConduct airless and atomised spraying operations
  • RIICRM207EInstall raised pavement markers
  • RIICRM301EConduct ride on road marking operations
  • RIICRM302EConduct long line road marking operations
  • RIICRM303EConduct thermo plastic road marking operations
  • RIICTB201EMaintain timber bridges
  • RIICTB202EApply bridge durability treatments
  • RIICTB203EProduce bridge drawings and sketches
  • RIICTB301EUndertake visual inspections
  • RIICTB302EInstall temporary support members
  • RIICTB303EErect temporary modular support systems (baileys) on existing bridges
  • RIICTB304EInstall or replace sub-structure members
  • RIICTB305EInstall or replace super-structure members
  • RIICTB306ESplice and connect timber members
  • RIICTB307EAssemble and disassemble temporary modular bridges
  • RIICTB308EInstall or replace truss members
  • RIICTB309EConstruct, maintain and remove coffer dams
  • RIICTB310EConstruct specialised timber deck systems
  • RIICTC301EInstall tunnelling constructions services
  • RIICTC302ELine tunnels
  • RIICTC303EExcavate tunnel by machine
  • RIICTC304EMuck out tunnel earthworks
  • RIICTC305EConstruct portals
  • RIICTC307Conduct tunnel boring machine operations
  • RIICTT301EConduct fluid assisted directional boring
  • RIICTT302EConduct impact moling, ramming and augering operations
  • RIICTT303EControl micro tunnelling and pipe-jacking operations
  • RIICTT304EUndertake on-line replacement for existing pipeline systems
  • RIICTT305EUndertake localised repair and sealing of existing pipeline systems
  • RIICTT306EInstall cure in-place linings for existing pipeline systems
  • RIICTT307ESpray linings for existing pipeline systems
  • RIICTT308EInstall close-fit linings for existing pipeline systems
  • RIICTT309EInstall slip lining in existing pipeline systems
  • RIICTT310ERenovate large diameter pipes and chambers
  • RIICWD503Prepare traffic management plans and traffic guidance schemes
  • RIIGOV201EComply with site work processes/procedures
  • RIIGOV401EApply, monitor and report on compliance systems
  • RIIHAN201EOperate a forklift
  • RIIHAN208EPerform dogging
  • RIIHAN211DConduct basic scaffolding operations
  • RIIHAN301EOperate elevating work platform
  • RIIHAN302DConduct intermediate scaffolding operations
  • RIIHAN307EOperate a vehicle loading crane
  • RIIHAN308Load and unload plant
  • RIIHAN309FConduct telescopic materials handler operations
  • RIIIMG301EMaintain site records
  • RIIMPO318Conduct civil construction skid steer loader operations
  • RIIMPO320Conduct civil construction excavator operations
  • RIIMPO327EConduct pipe layer operations
  • RIIMPO334EConduct skid steer loader operations using attachments
  • RIIMPO339AConduct side tipper operations
  • RIIOGF302EOperate drilling fluids and mud pits
  • RIIOGN303EOperate, monitor and maintain mud systems
  • RIIQUA201EMaintain and monitor site quality standards
  • RIIRIS201EConduct local risk control
  • RIIRIS202ERespond to site based spills
  • RIIRIS402ECarry out the risk management process
  • RIIRTM201EPosition, set-up and operate variable message signs
  • RIIRTM202EPosition, set-up and operate portable traffic signals
  • RIIRTM203EWork as a safety observer/spotter
  • RIIRTM301EOperate truck or trailer mounted attenuators
  • RIISAM201EHandle resources and infrastructure materials and safely dispose of nontoxic materials
  • RIISAM205ECut, weld and bend materials
  • RIISTD201ERead and interpret maps
  • RIIUND310EApply shotcrete underground
  • RIIVEH201EOperate a light vehicle
  • RIIVEH304EConduct tip truck operations
  • RIIWHS202Enter and work in confined spaces
  • RIIWHS204Work safely at heights
  • RIIWHS205EControl traffic with stop-slow bat
  • RIIWHS206Control traffic with portable traffic control devices and temporary traffic signs
  • RIIWHS302Implement traffic management plans
  • RIIWHS303Position, set up and program portable traffic control devices
  • RIIWHS304Implement traffic management plans on high volume roads
  • RIIWHS305Implement traffic management plans on motorways and freeways
  • RIIWMG203EDrain and dewater civil construction sites
  • RIIWMG301EControl construction site water tables
  • TAEDEL311Provide work skill instruction
  • TLID3011Conduct specialised forklift operations
  • TLIE2007Use communications systems
  • TLIE3004Prepare workplace documents
  • TLIL0007Complete workplace induction procedures
  • TLILIC0003Licence to operate a forklift truck

Matched to the current release

Every order is confirmed against RII30926's current training.gov.au release at fulfilment, so you always receive resources mapped to the national register.